where will aditya l1 land

where will aditya l1 land

4 hours ago 3
Nature

Aditya-L1, India's first dedicated solar mission, will be placed in a halo orbit around the Sun-Earth Lagrange point 1 (L1), which is about 1.5 million kilometers from Earth towards the Sun. This location allows the spacecraft to continuously observe the Sun without interruption from eclipses or occultations. The mission timeline and landing details are as follows:

  • Launched on September 2, 2023, from the Satish Dhawan Space Centre in Sriharikota.
  • After launch, Aditya-L1 spent about 16 days in Earth-bound orbits, performing five maneuvers to gain the velocity needed for its journey to L1.
  • On September 19, 2023, it executed a Trans-Lagrangian Point 1 injection maneuver to begin its approximately 110-day cruise to L1.
  • It reached the L1 point and was successfully inserted into a halo orbit around L1 on January 6, 2024.
  • The spacecraft will orbit L1 in an irregular halo orbit roughly perpendicular to the Earth-Sun line, allowing continuous solar observation.
  • The mission is planned to last about 5.2 years, conducting detailed studies of the Sun's outer layers and solar phenomena.

Thus, Aditya-L1 "lands" not on a surface but rather enters and remains in a stable halo orbit around the L1 point, approximately 1.5 million km from Earth in the direction of the Sun

Read Entire Article